PENJADWALAN PROYEK DENGAN METODE ACTIVITY ON ARROW (AOA) PADA PEMBANGUNAN ECOBRICK DLH SEMARANG
Abstract
Scheduling a construction in the presence of various obstacles including work delays that result in time delays from the planned time. The research method used to obtain data is carried out directly from the research object. So the research used the AOA (Activity On Arrow) method. This writing method begins with the calculation of ES, LS, EF, LF, and then AOA. Based on the results of the analysis used, the needs and implementation of the project have been categorized as good enough, but not supported by proper supervision. By applying the right AOA method, the amount of time required for each activity can be known and the critical trajectory of the work process can be known. The proper supervision is needed when the AOA method has a critical path / path. With the analysis of the AOA method, it takes 112 calendar days.
Keywords
scheduling, activity on arrow, critical path, time
Full Text:
PDFReferences
Abrar Husein (2011) Manajemen Proyek, Andi Offset, Yogyakarta.
Elis Ratna Wulan (2010), Manajemen Proyek dengan Pert dan CPM, Bandung
Irika Widiasanti, Lenggogeni, ((2013) Manajemen Konstruksi, Remaja Rosdakarya, Bandung
Wulfram I Ervianto, (2005). Manajemen Proyek Konstruksi, Andi Offset, Yogyakarta.
Nathanael Sitanggang, Janner Simarmata, Putri Lynna A. Luthan (2019) Pengantar Konsep Manajemen Proyek Untuk Teknik, Yayasan Kita menulis.
DOI: https://doi.org/10.26877/giratory.v2i1.28469
Refbacks
- There are currently no refbacks.

This work is licensed under a Creative Commons Attribution-ShareAlike 4.0 International License.
Jurnal Teknik Sipil Giratory UPGRIS
Program Studi Teknik Sipil
Fakultas Teknik dan Informatika
Universitas PGRI Semarang