ANALISIS PRODUKTIVITAS PEKERJA DENGAN METODE TIME STUDY PADA PEKERJAAN KOLOM (STUDI KASUS PROYEK REHABILITASI PASAR JOHAR KOTA SEMARANG)
Abstract
Worker productivity determines the success of the implementation of the construction project schedule, because it has an impact on the suitability between the construction schedule planning and the progress of work in the field. Therefore, the work of column and fungus which is one of the critical activities in the construction of rehabilitation needs to analyze the productivity of their work. This final project aims to analyze worker productivity in column and fungus work and look for any factors that can affect worker productivity in the Johar Market rehabilitation project in Semarang City. The calculation is done by the method time study. The time study method is a method of measuring labor productivity in the field by determining the standard time of a job. Standard time is obtained from observations. In the observation, the value basic time that will be processed becomes standard time, and is used to calculate the productivity value. From the calculation results obtained the value of worker productivity in chipping column work and chipping fungi work is 7,36 m2/OH, and 6,65 m2/OH. For the value of productivity in column and fungus reinforcement work is 42,81 kg/OH, and 21,87 kg/OH. While the productivity of column and fungus formwork is 14,47 m2/OH and 5,16 m2/OH. For productivity in column and fungus grouting work is 0,41 m3/OH, and 0,36 m3/OH, and the work of installing Fiber Reinforced Plastic (FRP) column and fungus is 4,40 m2/OH and 5,70 m2/ OH. From the results of productivity analysis, it is determined that the location of materials and workplaces, number of workers, relaxation allowances, tools and materials used are the factors that affect worker productivity in the work of column and fungus.
Keywords
Full Text:
PDFReferences
Ervianto, W. I. 2004. Teori Aplikasi Manajemen Proyek Konstruksi. Yogyakarta: Penerbit Andi.
Pawiro, S. 2015. “Optimalisasi Produktivitas Tenaga Kerja dalam Proyek Konstruksi”. Skripsi. Manado: Teknik Sipil, Fakultas Teknik Universitas Sam Ratulangi.
Tamamengka, J., Pratasis, P. A. K., & Walangitan, D. R. O. 2016. “Analisis Tenaga Kerja terhadap Produktivitas pada Konstruksi (Studi Kasus : Rehabalitas dan Perluasan Rumah Dinas Rektor Unsrat)”. Skripsi. Manado: Teknik Sipil, Fakultas Teknik, Universitas Sam Ratulangi.
Trisiany, E, M., and Halim, E. 2006. “Analisa Nilai Perbandingan Produktivitas Tenaga Kerja dengan Menggunakan Metode Standard dan Aktual (Studi Kasus Proyek X dan Y)”. Tugas Akhir. Surabaya: Universitas Kristen Petra.
DOI: https://doi.org/10.26877/giratory.v1i1.5421
Refbacks
- There are currently no refbacks.
Jurnal Teknik Sipil Giratory UPGRIS
Program Studi Teknik Sipil
Fakultas Teknik dan Informatika
Universitas PGRI Semarang