FACTORS AFFECTING DELAYS IN THE CONSTRUCTION PROJECT OF 5 FLOOR PARKING BUILDING ROEMANI HOSPITAL, SEMARANG.
Abstract
Full Text:
PDFReferences
Bakhtiyar, A. (2012). Analysis of Factors Affecting Delays in Building Construction Projects in Lamongan City. Civil Engineering Journal.
Foster, S. T. (2004). Managing Quality : an integrative Approach. Prentice Hall. Hasan, M.I. (2002). Main - Main Material Research Methodology and the application. Jakarta: Ghalia.
Hasibuan, M. S. (2006). Basic Management, Understanding, and Problems, Revised Edition. Jakarta: Earth Script.
Popescu, C. M., & Charoengam, C. (1995). Project Planning, Scheduling and Control in Construction. Canada: John Willey & Sons.
Tarore, H., & Mandagi, R. (2006). Project and Construction Management System (SIMPROKON). Manado: JTS Publishing Team, Faculty of Engineering, Sam Ratulangi University.
DOI: https://doi.org/10.26877/ijosbie.v4i1.16033
Refbacks
- There are currently no refbacks.
Copyright of International Journal of Sustainable Building, Infrastructure and Environment (IJOSBIE) ISSN 2716-4829 (online)
Universitas PGRI Semarang
Jl. Sidodadi Timur No. 24 - Dr. Cipto Semarang
Dr. Putri Anggi Permata S., M.T
Phone : +62 878 3229 1959
Email: putrianggi.permata2@gmail.com