Implementation of Building Information Modelling (BIM 3D) on the Steel Building project: Case study of the 3-storey building GKJ MARGOYUDAN

Kukuh Kurniawan Dwi Sungkono, Ronald Sukwadi

Abstract


Building Information Modelling (BIM) is a technological revolution developed in the construction industry. The implementation of BIM using Tekla Structure software helps overcome problems in the 3-story steel building construction project. Integration of the structural analysis software and Tekla Structure BIM, making the design phase efficient. Detailed drawings generated at the design stage using analysis software and BIM, lead to efficient construction exploration and evaluation. Tekla Structure produces detailed drawings and a list of required materials, which can help contractors in project management. Simultaneous management of activities between site and workshop, providing the advantage of project completion on schedule. Procurement of materials and errors during construction can be minimized, thereby optimizing project costs.

Full Text:

PDF

References


A. Basta, M. H. Serror, dan M. Marzouk, “A BIM-based framework for quantitative assessment of steel structure deconstructability,” Autom. Constr., vol. 111, no. October 2019, hal. 103064, 2020, doi: 10.1016/j.autcon.2019.103064.

B. Succar, “Building information modelling framework: A research and delivery foundation for industry stakeholders,” Autom. Constr., vol. 18, no. 3, hal. 357–375, 2009, doi: 10.1016/j.autcon.2008.10.003.

M. Wang, C. C. Wang, S. Sepasgozar, dan S. Zlatanova, “A Systematic Review of Digital Technology Adoption,” Build., vol. 2020, no. 10, hal. 1–29, 2020.

M. Firdaus Razali, N. Azam Haron, S. Hassim, A. Hizami Alias, A. Nahar Harun, dan A. Salihu Abubakar, “A Review: Application of Building Information Modelling (BIM) over Building Life Cycles,” IOP Conf. Ser. Earth Environ. Sci., vol. 357, no. 1, 2019, doi: 10.1088/1755-1315/357/1/012028.

K. K. D. Sungkono, “Aplikasi Building Informasi Modeling (Bim) Tekla Structure Pada Konstruksi Atap Dome Gedung Olahraga Utp Surakarta,” JUTEKS - J. Tek. Sipil, vol. 3, no. 2, hal. 273, 2019, doi: 10.32511/juteks.v3i2.278.

J. S. Lee, N. Kwon, N. H. Ham, J. J. Kim, dan Y. H. Ahn, “BIM-Based Digital Fabrication Process for a Free-Form Building Project in South Korea,” Adv. Civ. Eng., vol. 2019, no. Vdc, 2019, doi: 10.1155/2019/4163625.

C. B. Tatum, J. A. Vanegas, J. M. Williams, dan U. of Texas at Austin. Construction Industry Institute, Constructability Improvement Using Prefabrication, Preassembly, and Modularization. The Institute, 1986.

M. Gerges dkk., “BIM Role within the Conceptual Design Phase: A Case Study of a UK Construction Project,” Int. J. Archit. Eng. Constr., vol. 8, no. 1, 2019, doi: 10.7492/ijaec.2019.006.

E. J. Sippel dan H. B. Blum, “Structural analysis of steel structures with non-symmetric members,” Eng. Struct., vol. 245, no. December 2020, hal. 112739, 2021, doi: 10.1016/j.engstruct.2021.112739.

S. Firoz dan S. K. Rao, “Modelling Concept of Sustainable Steel Building by Tekla Software,” Int. J. Eng. Res. Dev., vol. 1, no. 5, hal. 18–24, 2012, [Daring]. Tersedia pada: www.ijerd.com.

S. Park dan I. Kim, “BIM-Based quality control for safety issues in the design and construction phases,” Archnet-IJAR, vol. 9, no. 3, hal. 111–129, 2015, doi: 10.26687/archnet-ijar.v9i3.881.




DOI: https://doi.org/10.26877/ijosbie.v3i2.13518

Refbacks

  • There are currently no refbacks.



Copyright of International Journal of Sustainable Building, Infrastructure and Environment (IJOSBIE) ISSN 2716-4829 (online)

Universitas PGRI Semarang
Jl. Sidodadi Timur No. 24 - Dr. Cipto Semarang

Dr. Putri Anggi Permata S., M.T
Phone : +62 878 3229 1959
Email: putrianggi.permata2@gmail.com